August 19, 2017
Timing Tested ready to go… I hope
Timing Tested ready to go… I hope
Hill Climb in Roberts Cove next Sat & Sun.
Shiney new finish beam. Laser pin point 15 Mtr range, built in hold signal switch time 0.005ms
Wireless transmitter 4KM range 0.002 ms trigger time.
LED Lights, uninterruptible power supply.
Shiney new finish beam. Laser pin point 15 Mtr range, built in hold signal switch time 0.005ms
Wireless transmitter 4KM range 0.002 ms trigger time.
LED Lights, uninterruptible power supply.
Start beam switch delay 0.005 – finish beam delay 0.005 +wake up 0.002
Everyone gets 0.002 taken off their race time :biggrin_old:
Results automatic printout as fast as the printer can spit them out when the last bike trips the beam.
What a nerdy hobby … Tag Heuer ….pffft
Link to Photo (764 kB)
Link to Photo (773 kB)
Right side up.. have a good day